1.This is the start of the process. Customers can choose any color for the plastic parts of the machine.
|
2.This is the second phase - the plastic parts are ready for assembling.
|
3.The steel material is prepared before processing and forming.
|
 |
 |
 |
|
4.The steel parts are going through a process of color spray and protective materials.
|
5.Robotic welding is processed in order to assure accuracy and increase the quality of the products final finish.
|
6.The assembling floor is ready for manufacturing last stage, and products also go through intense quality control.
|
 |
 |
 |
|
7.The machine parts are assembled, we are able to assemble hundreds of machines each day.
|
8.The machines are checked and tested one by one to assure they comply with the highest possible QC standards.
|
9.Each part of the machine is carefully examined, every detail is being checked.
|
 |
 |
 |
|
10.The machines are tested to check their durability and to assure they are ready for the sea journey.
|
11.After the machines are tested and no problem is found. The machines are transferred to the packing area.
|
12.We put most effort and thought to make sure all parts are placed correctly and the packing is strong enough to protect the machine.
|
 |
 |
 |
|
13.The machines are packed and getting ready for shipment. |
14.Loading of the container. Extra spare parts are added to the shipment. |
15.Shipping out of the factory. We're able to ship dozens of cartons a month. |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|